This 3 story 20,048 SF office building is an exciting new project located off Route 2 in downtown Glastonbury, CT.  This is a slab on grade 1st floor and Slab on Deck for the 2nd and 3rd floors. A Boston Blend Veneer stone to 9’ will wrap the first floor exterior with James Hardie lap siding on the rest of the building. Aluminum wrapped wood windows by Marvin compliment the exterior finish. The 3rd floor offices will contain high end finishes and will be the owners build out.

The addition to the existing Holyoke Community Charter School has been moving along.  This addition is a full size 24,000 sq ft steel framed Gymnasium which includes wood courts and bleachers up through a mezzanine level.  Construction also includes four classrooms, restrooms, lobby/display areas and support spaces. Projected completion expected for June 2023.

OSF Flavors, Inc.

Windsor, Connecticut

A thirty year old International company with branches in Europe, Asia, East Africa and USA hires

Orlando Annulli & Sons Inc to break ground on a planned 44,ooo  sq foot addition to their

existing facility in Windsor, CT.

The new addition will create additional warehouse space and a two-story R & D Pilot plant and

office area. The building features designs from Russel & Dawson A/E out of East Hartford CT

and Epstein Global of Chicago IL.

Public Safety Complex Impound Garage 
East Hartford, Connecticut

This active site will be a 12,489 sq. ft. pre-engineered Varco-Purden steel garage structure.

The town of East Hartford will use this facility to  hold impounded vehicles and house equipment of the Fire and Police departments.